Results


Deliv. No

Deliverable name

WP No

Deliv. Date

Public or not?

D1.1

Report comprising a chapter on the relevant experiences (e.g. with existing methods, technical problems and system requirements) from the different stakeholders in Europe for solving the congestion and balancing problem, a chapter proposing a unified nomenclature and the framework conditions for the case studies based on the pan-European DSO grid codes for DRES integration.

1

12/2013

Yes

D1.2

Report comprising a chapter on technical problems and system requirements on DS with high penetration of DRES., a chapter on provisions for AS and procurement from distribution-level connected DRES, a chapter on ICT, CS and net component requirements for Smart Grid implementation with a high penetration of distribution-level connected DRES, a chapter on the simulation platform architecture, features and framework and a chapter on general specifications and net component requirements for a distributed control system.

1

02/2014

Yes

D2.1

Overview of existing forecasting techniques for production (PV, wind) and consumption

2

02/2014

Yes

D2.2

Recommendations on real-time line rating and demand-side management

2

04/2014

Yes

D2.3

Evaluation of potential of the combined exploitation of selected optimisation techniques

2

02/2016

Yes

D2.4

Fast control strategy for three-phase four wire inverter for DRES

2

10/2014

No

D2.5

Agent-aggregator platform and its distributed algorithms

2

10/2014

No

D2.6

Probabilistic models to support DSOs for the provision of AS

2

06/2016

No

D3.1

Dynamic equivalent models for the simulation of controlled DRES

3

12/2014

No

D3.2

Integrated simulation platform which models the key components and control strategies

3

03/2015

Yes

D3.3

Report on simulation results and evaluation of the integrated simulation platform

3

08/2015

Yes

D3.4

Optimal coordinating strategies to harmonise multi services/objectives

3

10/2015

No

D4.1

Test plan and KPIs for the simulation

4

03/2015

Yes

D4.2

Prototype of three-phase four-wire inverter with the necessary protection algorithms

4

03/2015

No

D4.3

Specifications for network and labo-like field trials

4

09/2015

No

D4.4

Report on the laboratory experiments at the Power Quality lab of TU/e and UGent

4

12/2015

No

D4.5

Report on the field tests in the Dutch, Slovenian and Austrian grid

4

11/2016

No

D5.1

Report on common definition of AS in the Transmission system and in the Distribution system

5

10/2015

Yes

D5.2

Report on short-term market mechanisms for AS provision.

5

10/2015

Yes

D5.3

Report on necessary adjustments to the Regulatory framework

5

06/2016

Yes

D6.1

Assignment of dissemination and exploitation coordinator

6

09/2013

No

D6.2

First accessible version of the INCREASE website to allow promotion for the TSO/DSO stakeholder kick-off meeting in M3

6

10/2013

Yes

D6.3

Plan of action/communication strategy for dissemination of knowledge with annual updates and adjustments

6

10/2013

No

D6.4

INCREASE   visual identity: logo, templates for presentations, newsletters, etc.

6

10/2013

Yes

D6.5

Organisation of kick-off event where DREAM, EvolvDSO and IDE4L will take part

6

10/2013

Yes

D6.6

INCREASE workshops to be organised, one of the workshops concerning multi-agent based techniques will be organised in cooperation with the DREAM consortium

6

08/2015

Yes

D6.7

Plan for exploitation of results and further collaboration of partners after the project has ended

6

12/2016

No

D7.1

Project handbook

7

10/2013

No

D7.2

Intermediate progress report 1

7

02/2014

No

D7.3

Intermediate progress report 2

7

08/2014

No

D7.4

Intermediate progress report 3

7

08/2015

No

D7.5

Intermediate progress report 4

7

06/2016

No